{"id":10739,"date":"2025-11-25T12:21:44","date_gmt":"2025-11-25T09:21:44","guid":{"rendered":"https:\/\/www.diem.com.tr\/?p=10739"},"modified":"2025-11-25T12:32:07","modified_gmt":"2025-11-25T09:32:07","slug":"4-ayda-tamamlanan-3000m2-yeni-nesil-ofis-projesi","status":"publish","type":"post","link":"https:\/\/www.diem.com.tr\/en\/4-ayda-tamamlanan-3000m2-yeni-nesil-ofis-projesi\/","title":{"rendered":"New Generation Office Project Completed in 4 Months: 3,000 m\u00b2"},"content":{"rendered":"<h2 data-start=\"319\" data-end=\"337\">Project Summary<\/h2>\n<p data-start=\"683\" data-end=\"1084\">Located in the Ferko Signature building in Levent, the 3,000 m\u00b2 office was planned for the Turkey operations of a global e-commerce company. Diem acted as the main contractor for the project. All construction works, mechanical\u2013electrical installations, site coordination and technical fit-out processes were executed by our team, and the project was delivered in as little as four months.<\/p>\n<p data-start=\"1086\" data-end=\"1279\">This project stands out as a comprehensive implementation that required high-level coordination and multi-stakeholder management\u2014where an interior design that is modern, fluid and employee-focused was integrated with precise technical and construction execution.<\/p>\n<p data-start=\"363\" data-end=\"705\">With the post-pandemic shift away from full remote work and hybrid models being reshaped, the importance of physical office environments has risen once again. The rapidly growing team structure in Turkey and the return-to-office transition created a need for a larger, more modern and highly functional workspace in Istanbul for our client.<\/p>\n<p data-start=\"707\" data-end=\"1124\" class=\"translation-block\">In this context, Diem undertook the project as the main contractor. All architectural and construction works were delivered by our team in accordance with the global design criteria. The project also carries strategic value as it marks our fourth collaboration with the same global client\u2014demonstrating a long-term, trust-driven and continuously evolving partnership.<\/p>\n<p data-start=\"707\" data-end=\"1124\">\u00a0 \u00a0\u00a0<img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-large wp-image-10771\" src=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-5-1024x768.jpg\" alt=\"\" width=\"1024\" height=\"768\" srcset=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-5-1024x768.jpg 1024w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-5-300x225.jpg 300w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-5-768x576.jpg 768w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-5-1536x1152.jpg 1536w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-5-16x12.jpg 16w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-5-440x330.jpg 440w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-5.jpg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<h2 data-start=\"1286\" data-end=\"1335\"><strong data-start=\"1289\" data-end=\"1335\">Application Strategy Based on Existing Infrastructure<\/strong><\/h2>\n<p data-start=\"1337\" data-end=\"1413\">Before proceeding with implementation, we carried out a detailed analysis of the existing space, including:<\/p>\n<ul>\n<li data-start=\"1417\" data-end=\"1434\">infrastructure conditions<\/li>\n<li data-start=\"1417\" data-end=\"1434\">ceiling and floor levels<\/li>\n<li data-start=\"1417\" data-end=\"1434\">installation connection points<\/li>\n<li data-start=\"1417\" data-end=\"1434\">elements to be dismantled and preserved<br \/>\n.<\/li>\n<\/ul>\n<p data-start=\"1548\" data-end=\"1703\">This feasibility stage accelerated the overall process and enabled us to develop accurate implementation solutions fully aligned with the design intent.<\/p>\n<p data-start=\"1548\" data-end=\"1703\"><img decoding=\"async\" class=\"alignnone size-large wp-image-10770\" src=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-4-1024x768.jpg\" alt=\"\" width=\"1024\" height=\"768\" srcset=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-4-1024x768.jpg 1024w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-4-300x225.jpg 300w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-4-768x576.jpg 768w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-4-1536x1152.jpg 1536w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-4-16x12.jpg 16w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-4-440x330.jpg 440w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-4.jpg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<h2 data-start=\"1710\" data-end=\"1763\"><strong data-start=\"1713\" data-end=\"1763\">Transferring a Fluid Design Language Into Built Space<\/strong><\/h2>\n<p data-start=\"1765\" data-end=\"1930\">The design featured curved glass partitions, soft circulation lines and a transparent office layout\u2014elements requiring high precision during implementation.<\/p>\n<p data-start=\"1932\" data-end=\"1944\">As Diem, we executed:<\/p>\n<ul>\n<li data-start=\"1948\" data-end=\"1983\">custom-cut curved glass panels<\/li>\n<li data-start=\"1948\" data-end=\"1983\">black-framed glass partition systems<\/li>\n<li data-start=\"1948\" data-end=\"1983\">acoustic performance solutions<\/li>\n<li data-start=\"1948\" data-end=\"1983\">modern ceiling detailing<br \/>\nAll architectural components were delivered on-site with full fidelity to the drawings.<\/li>\n<\/ul>\n<p><img decoding=\"async\" class=\"alignnone size-large wp-image-10772\" src=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-5-1024x771.jpeg\" alt=\"\" width=\"1024\" height=\"771\" srcset=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-5-1024x771.jpeg 1024w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-5-300x226.jpeg 300w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-5-768x578.jpeg 768w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-5-1536x1156.jpeg 1536w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-5-16x12.jpeg 16w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-5-440x331.jpeg 440w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-5.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<h2 data-start=\"2205\" data-end=\"2264\"><strong data-start=\"2208\" data-end=\"2264\">Construction and Technical Execution of Flexible Workspaces<\/strong><\/h2>\n<p data-start=\"2266\" data-end=\"2357\">In line with the functional zoning strategy, all construction activities were managed meticulously, including:<\/p>\n<ul>\n<li data-start=\"2361\" data-end=\"2394\">installation of open-plan work modules<\/li>\n<li data-start=\"2361\" data-end=\"2394\">acoustic insulation of meeting rooms<\/li>\n<li data-start=\"2361\" data-end=\"2394\">construction of quiet rooms and phone booths<\/li>\n<li data-start=\"2361\" data-end=\"2394\">social area and open kitchen fit-out<\/li>\n<li data-start=\"2361\" data-end=\"2394\">modular ceiling and lighting systems<\/li>\n<li data-start=\"2361\" data-end=\"2394\">electrical, mechanical and data infrastructure<\/li>\n<\/ul>\n<p data-start=\"2624\" data-end=\"2742\">Throughout the process, real-time coordination was maintained with design teams to ensure compliance with global standards.<\/p>\n<p data-start=\"2624\" data-end=\"2742\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-10767\" src=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-1-1024x771.jpeg\" alt=\"\" width=\"1024\" height=\"771\" srcset=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-1-1024x771.jpeg 1024w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-1-300x226.jpeg 300w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-1-768x578.jpeg 768w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-1-1536x1156.jpeg 1536w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-1-16x12.jpeg 16w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-1-440x331.jpeg 440w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-1.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<h2 data-start=\"2749\" data-end=\"2814\"><strong data-start=\"2752\" data-end=\"2814\">Seamless Coordination With International Design &amp; Control Teams<\/strong><\/h2>\n<p data-start=\"2816\" data-end=\"2961\" class=\"translation-block\">The project was closely monitored by the client\u2019s global design teams throughout execution. As the main contractor, we successfully managed:<\/p>\n<ul>\n<li data-start=\"2965\" data-end=\"2995\">weekly progress reports<\/li>\n<li data-start=\"2965\" data-end=\"2995\">regular site photography and documentation<\/li>\n<li data-start=\"2965\" data-end=\"2995\">online coordination with international teams<\/li>\n<li data-start=\"2965\" data-end=\"2995\">technical drawing and implementation alignment<br \/>\n.<\/li>\n<\/ul>\n<p data-start=\"3165\" data-end=\"3351\">Multiple international stakeholders on the design side made this a multi-layered process, yet site coordination was managed smoothly by Diem.<\/p>\n<p data-start=\"3165\" data-end=\"3351\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-10762\" src=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-AMZFERKO-cover-1024x605.jpeg\" alt=\"\" width=\"1024\" height=\"605\" srcset=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-AMZFERKO-cover-1024x605.jpeg 1024w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-AMZFERKO-cover-300x177.jpeg 300w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-AMZFERKO-cover-768x454.jpeg 768w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-AMZFERKO-cover-1536x907.jpeg 1536w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-AMZFERKO-cover-18x12.jpeg 18w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-AMZFERKO-cover-440x260.jpeg 440w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-AMZFERKO-cover.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<h2 data-start=\"3358\" data-end=\"3412\"><strong data-start=\"3361\" data-end=\"3412\">Lessons Learned \u00c7\u0131kt\u0131lar\u0131n\u0131n Uygulamaya Katk\u0131s\u0131<\/strong><\/h2>\n<p data-start=\"3414\" data-end=\"3601\" class=\"translation-block\">The post-project Lessons Learned review led to key takeaways in construction execution, technical solutions and site coordination. These insights have strengthened our processes in areas such as:<\/p>\n<ul>\n<li data-start=\"3605\" data-end=\"3631\">faster mobilisation<\/li>\n<li data-start=\"3605\" data-end=\"3631\">earlier material planning<\/li>\n<li data-start=\"3605\" data-end=\"3631\">improved coordination in multi-stakeholder projects<br \/>\n.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-10769\" src=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-3-1024x768.jpg\" alt=\"\" width=\"1024\" height=\"768\" srcset=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-3-1024x768.jpg 1024w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-3-300x225.jpg 300w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-3-768x576.jpg 768w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-3-1536x1152.jpg 1536w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-3-16x12.jpg 16w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-3-440x330.jpg 440w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2025\/11\/case-study-FERKOAMZ-photos-3.jpg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<h1 data-start=\"3148\" data-end=\"3159\">Conclusion<\/h1>\n<p data-start=\"4664\" data-end=\"4846\">This 3,000 m\u00b2 office project is more than just a modern workspace\u2014it is a strong example of architectural execution where technology, design and international project management come together.<\/p>\n<p data-start=\"4848\" data-end=\"4874\">Delivering a workplace that is:<\/p>\n<ul>\n<li data-start=\"4878\" data-end=\"4906\">globally compliant<\/li>\n<li data-start=\"4878\" data-end=\"4906\">fluid in design<\/li>\n<li data-start=\"4878\" data-end=\"4906\">employee-oriented<\/li>\n<li data-start=\"4878\" data-end=\"4906\">technically robust<\/li>\n<\/ul>\n<p data-start=\"5007\" data-end=\"5123\">within only four months reflects Diem\u2019s capability and excellence in both architectural and construction delivery.<\/p>","protected":false},"excerpt":{"rendered":"<p>Proje \u00d6zeti Levent\u2019teki Ferko Signature binas\u0131nda yer alan 3.000 m\u00b2\u2019lik ofis, global bir e-ticaret firmas\u0131n\u0131n T\u00fcrkiye operasyonlar\u0131 i\u00e7in planlanm\u0131\u015ft\u0131. Diem olarak projede ana y\u00fcklenici rol\u00fcn\u00fc \u00fcstlendik. T\u00fcm in\u015fai i\u015fler, mekanik\u2013elektrik uygulamalar\u0131, saha koordinasyonu ve teknik montaj s\u00fcre\u00e7leri taraf\u0131m\u0131zca y\u00fcr\u00fct\u00fclerek proje [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10768,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[63],"tags":[],"class_list":["post-10739","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-study"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/posts\/10739","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/comments?post=10739"}],"version-history":[{"count":9,"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/posts\/10739\/revisions"}],"predecessor-version":[{"id":10778,"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/posts\/10739\/revisions\/10778"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/media\/10768"}],"wp:attachment":[{"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/media?parent=10739"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/categories?post=10739"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/tags?post=10739"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}