{"id":109,"date":"2022-09-05T08:17:08","date_gmt":"2022-09-05T08:17:08","guid":{"rendered":"http:\/\/themes.themegoods.com\/architecturer\/demo\/?p=109"},"modified":"2023-06-07T08:23:56","modified_gmt":"2023-06-07T08:23:56","slug":"case-study-emaar-skyview","status":"publish","type":"post","link":"https:\/\/www.diem.com.tr\/en\/case-study-emaar-skyview\/","title":{"rendered":"Case Study: Emaar SkyView"},"content":{"rendered":"<p>The Emaar Square Mall project of the world's leading real estate giant Emaar, located in \u00dcsk\u00fcdar, Istanbul, has been welcoming its visitors since 2017. It includes a shopping center, restaurants, office floors and residences. In 2019, the LEED Gold certified Emaar North Tower, which includes a hotel, was added in connection with the shopping center, and in 2022, the Emaar SkyView project was launched on the 47th and 48th floors of the North Tower, 284 meters above the sea, with an area of 2650 m\u00b2.<\/p>\n<p class=\"translation-block\">Emaar SkyView project coordination was successfully completed by Diem Engineering Architecture with electrical and mechanical consultants and quality control by Hill International. Diem has thus added a new one to its architectural projects, which are completed by teams of experts in construction projects and make a difference. Testing and performance measurements of the project are currently underway.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-3736\" src=\"https:\/\/www.diem.com.tr\/wp\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-2-300x199.jpg\" alt=\"\" width=\"1140\" height=\"757\" srcset=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-2-300x199.jpg 300w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-2-1024x680.jpg 1024w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-2-768x510.jpg 768w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-2-18x12.jpg 18w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-2-700x466.jpg 700w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-2-440x292.jpg 440w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-2.jpg 1383w\" sizes=\"(max-width: 1140px) 100vw, 1140px\" \/><\/p>\n<p><strong>How did the Emaar SkyView project start?<\/strong><\/p>\n<p>As Diem Engineering and Architecture, we have implemented the common areas of all office blocks in Emaar Turkey since 2018. At the end of 2020, the Diem proposal team attended the project development phase of the Emaar SkyView project. The Emaar SkyView project started in 2021 with the tender process.<\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-3737\" src=\"https:\/\/www.diem.com.tr\/wp\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-3-300x200.jpg\" alt=\"\" width=\"1140\" height=\"761\" srcset=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-3-300x200.jpg 300w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-3-1024x684.jpg 1024w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-3-768x513.jpg 768w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-3-18x12.jpg 18w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-3-700x466.jpg 700w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-3-440x294.jpg 440w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-3.jpg 1384w\" sizes=\"(max-width: 1140px) 100vw, 1140px\" \/><br \/>\n<strong>As Diem, we took part in a different project than our previous projects.<\/strong><\/p>\n<p>The Emaar SkyView project was different from our previous projects for us. The Emaar SkyView project differed from the others as a more boutique project compared to our previous office, head office buildings, industrial facilities and shopping centre projects.<\/p>\n<p>Canadian GSM company made the architectural design and material selections of the Emaar SkyView project. It was necessary to examine and develop the details very well for the intended visual effect by adhering to the design. It was a project in which it was significant to draw and apply the materials according to the production from the joint detail solutions to each point.<\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-3738\" src=\"https:\/\/www.diem.com.tr\/wp\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-4-300x200.jpg\" alt=\"\" width=\"1140\" height=\"761\" srcset=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-4-300x200.jpg 300w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-4-1024x684.jpg 1024w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-4-768x513.jpg 768w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-4-18x12.jpg 18w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-4-700x466.jpg 700w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-4-440x294.jpg 440w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-4.jpg 1384w\" sizes=\"(max-width: 1140px) 100vw, 1140px\" \/><\/p>\n<p><strong>We quickly adapted to the project tracking system<\/strong><\/p>\n<p>Emaar had a project tracking system that it coordinated with its global team. He had consultants in the fields of architecture, electricity and mechanics. When we, as specialist contractors, prepared our drawings, we first shared our drawings with the consultants over the system, and received comments from them for our drawings, thus advancing the approval process. We advanced the process with technical analysis, manufacturing drawings, material approvals and mock-up presentations. We carried out the field applications by adhering to the design and approvals, following the approval processes together with our customers and their consultants. We passed every production made during the application phase under the control of Hill International and ensured that it was passed to the next stage.<\/p>\n<p>On the 47th floor, floor covering with pebble terrazzo and also the wall covering applications were made by Diem. On the 48th floor, the floor, wall and ceiling applications were completed by Diem. There was a high acoustic ceiling on the 48th floor. About 70 tons of steel fabrication was done by us in connecting the ceiling to the roof. The Emaar SkyView project was an important project for us in terms of the rapid implementation of metal fabrication on the 49th floor of this weigh.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-3739\" src=\"https:\/\/www.diem.com.tr\/wp\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-5-225x300.jpg\" alt=\"\" width=\"470\" height=\"627\" srcset=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-5-225x300.jpg 225w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-5-9x12.jpg 9w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-5-440x587.jpg 440w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-5.jpg 768w\" sizes=\"(max-width: 470px) 100vw, 470px\" \/><\/p>\n<p><strong>How did we overcome the difficulties encountered in the project?<\/strong><\/p>\n<p>In front of us was a serious, global and corporate organization like Emaar. There were also difficult processes that required us to work simultaneously with the other contractors that built the hotel. In the project management process, we had to adapt to the project coordination system, which was new to us. We encountered difficulties in the process, but this situation added experience to our team. The project process enabled us to gain more experience with our team both technically and in the construction area.<\/p>\n<p>There were extensions independent of Diem in the processes until he went to the construction area. We had to work in winter conditions. For these reasons, it was necessary to work in the outer terrace area at the 47th-floor level and the production stopped due to the weather conditions. However, as Diem, we trusted our construction team, our coordination and speed, despite all the problems in external processes. We progressed through the construction phase very quickly.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-3740\" src=\"https:\/\/www.diem.com.tr\/wp\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-6-300x200.jpg\" alt=\"\" width=\"1140\" height=\"761\" srcset=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-6-300x200.jpg 300w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-6-1024x684.jpg 1024w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-6-768x513.jpg 768w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-6-18x12.jpg 18w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-6-700x466.jpg 700w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-6-440x294.jpg 440w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-6.jpg 1384w\" sizes=\"(max-width: 1140px) 100vw, 1140px\" \/><\/p>\n<p><strong><em>\u201cI am proud of the work we have done and the dedication of my teammates because it was a job that had been done under very stressful and challenging field conditions. We responded well to the problems and concluded by owning our work with team spirit' - Project Manager \/ Architect Bora Er\u015fen<\/em><\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-3741\" src=\"https:\/\/www.diem.com.tr\/wp\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-7-300x200.jpg\" alt=\"\" width=\"1140\" height=\"761\" srcset=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-7-300x200.jpg 300w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-7-1024x684.jpg 1024w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-7-768x513.jpg 768w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-7-18x12.jpg 18w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-7-700x466.jpg 700w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-7-440x294.jpg 440w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-7.jpg 1384w\" sizes=\"(max-width: 1140px) 100vw, 1140px\" \/><\/p>\n<p><strong>What did we learn?<\/strong><\/p>\n<ul>\n<li>It is significant to understand the job you are trying to get, to give accurate responses to the contracts, to make technical investigations, and to work with the right partners, in terms of the processes of the project and time planning.<\/li>\n<li>It is necessary to have a team with professional and technical competence that will lead the shop drawing, approval processes and coordination with high quality.<\/li>\n<li>The drawings should be detailed and developed. Drawings should be exactly following the construction by keeping in touch with the manufacturers in the market.<\/li>\n<li>Architectural, electrical and mechanical teams need to be well-coordinated in drawing and communication. Thus, time waste can be minimized.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-3742\" src=\"https:\/\/www.diem.com.tr\/wp\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-8-300x200.jpg\" alt=\"\" width=\"1140\" height=\"761\" srcset=\"https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-8-300x200.jpg 300w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-8-1024x684.jpg 1024w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-8-768x513.jpg 768w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-8-18x12.jpg 18w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-8-700x466.jpg 700w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-8-440x294.jpg 440w, https:\/\/www.diem.com.tr\/wp-content\/uploads\/2018\/08\/case-study-emaar-skyview-8.jpg 1384w\" sizes=\"(max-width: 1140px) 100vw, 1140px\" \/><\/p>","protected":false},"excerpt":{"rendered":"<p>D\u00fcnyan\u0131n \u00f6nde gelen gayrimenkul devi Emaar\u2019\u0131n, \u0130stanbul \u00dcsk\u00fcdar&#8217;da yer alan Emaar Square Mall projesi 2017\u2019den beri ziyaret\u00e7ilerini a\u011f\u0131rl\u0131yor. \u0130\u00e7erisinde al\u0131\u015fveri\u015f merkezi, restoranlar, ofis katlar\u0131 ve konutlar yer al\u0131yor. 2019 y\u0131l\u0131nda al\u0131\u015fveri\u015f merkezi ile ba\u011flant\u0131l\u0131 olacak \u015fekilde i\u00e7erisinde otel yer alan, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3735,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[63,64,66],"tags":[],"class_list":["post-109","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-study","category-mimarlik","category-ofis"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/posts\/109","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/comments?post=109"}],"version-history":[{"count":6,"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/posts\/109\/revisions"}],"predecessor-version":[{"id":3731,"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/posts\/109\/revisions\/3731"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/media\/3735"}],"wp:attachment":[{"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/media?parent=109"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/categories?post=109"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.diem.com.tr\/en\/wp-json\/wp\/v2\/tags?post=109"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}